HI , I am using Extensible calendar which follows Ext3.2 in my application ,i want to migrate it from 3.2 to Ext4.1 can anyone please tell me the process of migration with minimal changes in the code.

Thank you.

scottmartin
18 Jan 2014, 5:58 AM
That would be difficult to answer with no details.

What errors do you get now?
Are you using MVC?
Have you checked on the Extensible forums for examples?

I do not believe there is a migration guide for this, you would just need to use the correct files and continue.

Here is an example of someone using 4.1:
http://ext.ensible.com/forum/viewtopic.php?f=2&t=554&p=2776&hilit=MVC#p2775

Scott.

19 Jan 2014, 3:56 AM
Thank you :) scott

I am currently working on 4.1 Extjs , i Used calendar app of Ext 3.2 version in it,now i want to upgrade it to 4.1
i had included the Extensible 1.5.2 version calendar app in it which is in mvc architecture. i am facing a problems like even when i am including all required files like view related ,or data related they are loading but i am facing problems in loading AbstractCalendar.js where there is some Extensible.Date which is undefined ..

but thanks for the link ,ill try that and get back to you..:)
thank you :)

21 Jan 2014, 10:26 PM
Its Working fine now, I used mvc architecture i removed some of the previous configuration files which are of advanced version.